Get a clear look at the Ardmore Industrial Airpark: what operates today, how air and rail connect, and which upgrades are still being planned.

Ardmore Industrial Airpark infrastructure brings several big pieces together in one place: runways, rail, highway access, utilities, and developable land. It is also part of a foreign-trade zone. The easiest way to understand the Airpark is to separate what works today from what is still being planned.
Start with what's there today
Two sources give the clearest picture of current operations: the ADA's Airpark property listing and the current FAA Chart Supplement. State project lists and local legislative priorities look ahead. They describe ideas, needs, and funding goals rather than finished improvements.
The ADA places the former Army Air Force base northeast of Ardmore. Its listing identifies more than 1,000 developable acres available for long-term lease, along with both aviation and non-aviation tenants.
That acreage is a useful starting point, but every project is different. A company looking at the site would still need to confirm the parcel, lease terms, utility capacity, security, and access for its particular operation.
Two runways, a tower, and fuel
The airfield has two runways. The ADA rounds their dimensions to 9,000 by 150 feet and 5,400 by 100 feet. The FAA lists the more exact measurements: 9,002 by 150 feet for Runway 13/31 and 5,404 by 100 feet for Runway 17/35.
The FAA record also lists an air traffic control tower, weather reporting, Jet A and 100LL fuel, and lighting. Runway 31 has an instrument landing system. These are meaningful operating features, especially for aviation or aerospace users.
Hours and conditions can change, though. Pilots and operators should check current NOTAMs, approaches, weight limits, tower hours, and fuel availability before making an operational decision.
Rail adds another way to move freight
The ADA says a spur from the BNSF main line serves the Airpark. It also says the AmeriPointe rail loop can hold more than 150 fully loaded cars.
A transload station can move liquid or dry cargo among rail, pipeline, truck, and onsite storage. That gives manufacturers and distributors another option when a shipment is too large or too heavy to make sense by air or truck alone.
There is an important catch. Ardmore's 2025 Economic Vision Plan says the loop had carried large wind-turbine blades. When the plan was written, the loop was not set up to onload a unit train. The plan also points to possible rail expansion, a road constraint, and limited water capacity.
In other words, rail service is real, but the details still matter. A serious user would want to confirm loading methods, switching arrangements, cargo handling, utility needs, and timing with the appropriate operators.
I-35 is nearby, but not at the front gate
The Airpark sits northeast of Ardmore rather than directly beside Interstate 35. From I-35, ADA directions follow State Highway 53E for about nine miles. Another route runs north from Ardmore on U.S. Highway 77 before turning onto Highway 53E.
That is a workable connection to the north-south interstate corridor, but it is not an interstate-frontage site. For freight, the last few miles may matter as much as the highway itself. Bridge limits, turning movements, road condition, oversize-load rules, and travel time all depend on the load.
Foreign-trade-zone status and utilities
The ADA's Foreign Trade Zone page identifies the Airpark and Westport Industrial Park as Ardmore's two sites inside FTZ #227. Qualifying companies may find advantages involving customs duties, re-exports, entry procedures, or inventory taxes.
Being inside the zone does not make every shipment eligible. A company would still need to review its merchandise, production plans, recordkeeping, and U.S. Customs requirements with the right officials.
The Airpark listing includes water, sewer, electricity, natural gas, and high-speed telecommunications. The Economic Vision Plan also names water capacity as a challenge for future industrial recruitment. A parcel can have service and still need upgrades for a high-demand project, so capacity and connection costs need a project-specific check.
What's on the drawing board
Oklahoma's future project list for Ardmore Municipal Airport includes taxiway work, guidance systems, and a terminal. It also lists an air-cargo taxiway, apron improvements, and later runway projects. The page groups those projects into planning periods. It is not a promise that each one is funded or under construction.
Ardmore's 2026 legislative priorities also call for road, water, utility, taxiway, and site-readiness work. That tells you where local leaders want the Airpark to grow. Check the latest airport, city, state, and ADA updates before counting a proposed project as complete.
A quick checklist for a closer look
If the Airpark is on your shortlist, bring the project down to a few practical questions:
- Which parcel is available, and who controls it?
- What runway, rail, and truck access does the operation actually need?
- Can current utilities handle the expected load?
- Which improvements are funded, and which are still proposals?
- Who pays for project-specific work, and how long could it take?
Visiting from outside the area? The Ardmore lodging guide can help with an overnight plan. The weekend guide to Ardmore and Things to Do hub offer ideas for time outside meetings.
A note on the sources: Current features and future projects come from public operating, property, and planning records. No tenant or agency paid for coverage, and Chamber membership did not determine inclusion. Confirm technical, customs, engineering, and investment details with the responsible agencies before relying on them.